Upgrading the Maintenance Yard for the City of Surrey

Phoenix was hired by the City of Surrey to help with the upgrade of their maintenance yard.

Using our 160 Ton Copma Crane, alongside a Tractor Trailer, our operators lifted and transported a 26,000 lbs concrete water chamber.